www.economica.net/autostrada-a1-lugoj-deva-30_1000
The Timișoara Regional Directorate of Roads and Bridges showcases progress on the Margina - Holdea section of the A1 highway, featuring Romania's longest tunnel. Construction is ongoing with 83% physical completion, focusing on tunnel galleries, viaducts, and road structures. The project, costing 1.82 billion lei, is set for completion in 2027, allowing uninterrupted travel from Boița to Nădlac. The Austrian method is employed for tunnel construction, ensuring modern standards.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.