bizbrasov.ro/2026/11/27/investitie-fote-poiana-bra
Brașov City Hall is preparing for the 2027 European Youth Olympic Winter Festival by investing in the Subteleferic ski slope infrastructure. A permanent fiber optic network will be installed for timing systems, costing around 900,000 lei. This project aims to enhance communication for official timing and broadcasting during competitions. Currently, temporary cables are used, risking damage and increasing costs. The new infrastructure will remain for future events, ensuring reliable data transmission. The project includes aerial and buried cable installations, with completion required by December 15, 2026, to allow for testing before the festival.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.