www.economica.net/autostrada-unirii-a8-pod-5_99967

The Iași Regional Directorate of Roads and Bridges showcases new images from the construction site of the first bridge over the Prut River in 60 years, part of the A8 highway connecting Romania and Moldova. The project is progressing with metal deck welding and the development of customs points and access roads. Construction began last spring and is currently about 60% complete. The bridge complex consists of two parallel bridges, each approximately 260 meters long, funded by European sources.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.