www.economica.net/metroul-de-otopeni-36_999615.htm
Significant progress has been reported on the M6 Metro line in Bucharest, connecting the city to Henri Coandă Airport. The total route spans 14.2 km with 12 stations, divided into two sections. The Southern section is 80% complete, while the Northern section is at 36%. Both sections are actively being worked on with tunnel boring machines. The entire project is expected to be finished by early 2029, fulfilling a long-awaited need for residents of Bucharest and Ilfov County.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.