www.antena3.ro/actualitate/ministrul-transporturil
The Margina-Holdea section of the Lugoj-Deva Highway is 83% complete, with traffic expected to open next year. The construction involves various tasks including tunnel gallery work and system installations. Testing of tunnel systems will occur before the opening, with a total project cost of 1.82 billion lei.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.