newsweek.ro/economie/hidroelectrica-investitie-141
Hidroelectrica plans to invest 1.41 billion lei in floating solar panels and battery storage on the Olt River, with a projected payback period of 5.5 years. The investment will be voted on by shareholders on December 22, 2026, covering five hydroelectric plants. Each site will feature 20 MWp of solar capacity and 40 MW of battery storage. The total expected solar capacity is 100 MWp, with annual production estimated at 124.7 GWh. The funding will come from the company's own resources, with the Romanian state holding an 80.0561% stake.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.