bizbrasov.ro/2026/11/19/amenajare-promenade-castan

The project for a modern promenade on Castanilor Street in Brașov is set for European funding application, with revised costs significantly lower than initial estimates. The total investment is now projected at approximately 9.5 million lei, down from 15 million. Local councilors are expected to approve the technical-economic indicators soon. The chosen scenario for the project offers a better cost-benefit ratio and lower operational costs. The architectural concept features innovative solutions, including a water organ and evaporative cooling elements, alongside a spacious pedestrian area.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.