economedia.ro/cfr-suspenda-circulatia-trenurilor-p
Train services between Telciu and Dealul Ștefăniței will be suspended starting November 19 for viaduct rehabilitation. The decision follows a technical assessment of the structure built in 1948. The viaduct, measuring 99.4 meters, requires repairs to ensure safety. A contract worth approximately 29.7 million lei has been signed for the work. Alternatives for passenger transport are being considered, including road transfers. Train operations will resume after the completion of the rehabilitation and safety checks.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.