alba24.ro/vor-incepe-reparatiile-pe-sectorul-de-dr
Repairs will commence on the DJ 107F county road in Lunca Mureșului, which has been affected by landslides. The project includes consolidation and support structures to ensure safety for local residents. The work will involve various engineering solutions, including drilled piles and retaining walls, and is expected to take six months at a cost of 8.88 million lei. Traffic restrictions are currently in place in the affected area.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.