www.economica.net/terminam-anul-acesta-cu-4-000-mw
New investments in electricity production and storage capacities, totaling thousands of MW, are expected to alleviate pressure on the energy system and prices, according to the head of the National Energy Dispatcher. Virgiliu Ivan from Transelectrica reported that nearly 3,500 MW have been connected to the grid this year, with expectations to exceed 4,000 MW by year-end. He anticipates another 4,000 MW of new production capacity next year, which should improve the current high prices caused by production deficits. The energy system is evolving positively in production, storage, and network development, suggesting a significant improvement in the energy landscape by spring next year. Romania has surpassed 20,000 MW in installed battery capacity, driven mainly by solar energy growth, while new gas generation capacities are also expected to come online soon.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.