www.oradesibiu.ro/2026/11/12/autostrada-brasov-fag

The Brașov–Făgăraș highway, measuring 49.3 km, is set to receive budget allocation in 2027, as announced by the president of Brașov County Council. Currently, the project for construction authorization and technical design is underway, allowing CNAIR to initiate the bidding process. This highway will connect Sibiu to Brașov, complementing the ongoing A13 Sibiu–Făgăraș construction. The highway will feature three interchanges, 49 bridges, and three artificial tunnels for wildlife crossing. The project has received environmental approval and is estimated to cost 9.35 billion lei. Once completed, it will significantly enhance traffic flow between Sibiu and Brașov, totaling nearly 120 km of highway.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.