www.g4media.ro/pasaj-subteran-oltenitei-sectorul-4

Sector 4 has initiated construction on an underground road passage at the intersection of Olteniței Road and Vitan-Bârzești Road, estimated to cost 320 million lei. The project includes a 442-meter covered section with two lanes in each direction, while trams will operate above ground. The mayor emphasized the importance of integrating public transport and green spaces in urban development. The project aims to alleviate congestion and improve connectivity in Bucharest. Construction will be carried out by Concelex, with measures in place to prevent flooding. Traffic restrictions will be implemented in phases to minimize disruption.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.