www.economica.net/metroul-de-otopeni-35_994552.htm
Metrorex reports progress on Metro Line 6, with TBM "Sfânta Maria" reaching the Expoziției station and the launch of TBM "Sfânta Parascheva" for the North section. Ongoing construction includes various stations with significant completion percentages. The South section is 78% complete, while the North section is at 36%.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.