www.g4media.ro/digul-de-pe-raul-jiu-intre-localita

A section of the Jiu River's left bank dam in Dolj County is undergoing reinforcement works to enhance flood defense capabilities. The project involves completing the embankments and repairing the dam structure, including an area with a breach. The works are being carried out by the Dolj Water Management System teams and are on schedule. Approximately 975 cubic meters of soil will be used to restore the dam's crown to the project specifications. The aim is to ensure a functional and safe flood defense system, especially after past flooding incidents in the area.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.