www.mediafax.ro/economic/nuclearelectrica-unitatea
Both reactors at Cernavodă will reach maximum power on Friday, contributing about 20% to Romania's national energy consumption. Unit 1 will reconnect to the National Energy System on November 12 after repairs, achieving nominal power on November 13. The reactor was disconnected due to a fault in the non-nuclear control system, but there was no impact on nuclear safety. Unit 2 was connected to the grid on Wednesday and will reach nominal power on November 12. Currently, Romania is importing electricity to meet demand, with a significant portion coming from gas and solar sources.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.