www.g4media.ro/elcen-anunta-ca-instalatiile-sunt-s

ELCEN has reported significant pressure on Bucharest's energy security due to excessive water losses in the heating network managed by Termoenergetica. The company is forced to introduce nearly 1,900 tons of hot water per hour to compensate for these losses, which indicates numerous leaks and ongoing repairs. This situation not only affects the supply of heating and hot water but also poses risks to energy security and electricity production. The losses exceed contractual limits, leading to operational challenges for ELCEN's facilities. The need for simultaneous modernization of both the heating plants and the distribution network is emphasized to ensure reliable service for residents.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.