economedia.ro/sistemul-de-termoficare-din-bucurest

Electrocentrale București (ELCEN) warns that losses in the heating network are affecting thermal and electric energy production. The company needs to introduce 1,860 tons of water per hour to compensate for these losses, which could impact hot water and heating supply to residents. ELCEN attributes these issues to leaks and malfunctions in the distribution network managed by Termoenergetica. The situation is critical at CET București Sud, where water input exceeds contractual limits. ELCEN emphasizes that these losses indicate significant imbalances in the heating network, which could lead to reduced energy production capacity and affect the national energy system.

Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.