alba24.ro/video-lucrari-pe-o-strada-din-blaj-prima
The Blaj City Hall is undertaking stormwater drainage works on Prundului Street to address flooding issues. The project, costing 500,000 lei, targets areas where rainwater frequently enters residents' yards and basements. Mayor Gheorghe Valentin Rotar announced that the work is expected to be completed next week, with plans for further drainage improvements on Borza Street. The project includes a 150-square-meter underground drainage system designed to prevent future flooding. The mayor emphasized the importance of these improvements for the local community and indicated ongoing rehabilitation efforts in the municipality, weather permitting.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.