www.gandul.ro/actualitate/reactorul-1-de-la-cernav
Reactor 1 of the Cernavodă Nuclear Power Plant will be reconnected to the National Energy System on Friday, with synchronization starting at 11:00 AM. The unit was shut down on July 28 due to low water levels in the Danube, affecting Romania's electricity production. The restart is crucial for energy security and stability, while Reactor 2's return depends on a stable increase in water levels.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.