observatornews.ro/eveniment/noi-restrictii-pe-dn1-
Traffic on DN1 entering Bucharest will be restricted to two lanes due to ongoing Metro Line 6 construction. This area is heavily trafficked, with over 50,000 vehicles daily. The traffic organization includes a movable metal barrier that adjusts overnight. Work occurs from 11 PM to 5 AM, allowing two lanes in each direction during this time. After adjustments, traffic will flow with two lanes towards Bucharest and three lanes towards Otopeni. Drivers are advised to exercise caution and follow temporary road signs.
Fact-check this story: paste the text or link into Justificat.ro and get a verdict with the sources consulted.