VIDEO Misiune eșuată pentru centrala de la Cernavodă. Armata revine mâine cu explozibili ca să dea jos stânca Pârjoaia de pe Dunăre - Economica.net
The military's attempt to divert the Danube River to increase water levels for Cernavodă Nuclear Power Plant's reactor 2 has failed. Further explosive tests are planned to break the rock obstructing the river. The operation aims to create an underwater dam to redirect water flow. Currently, navigation on the Bala arm remains normal, and safety measures are in place. The intervention involves over 100 soldiers and technical equipment to prevent reactor shutdown due to low water levels.