VIDEO | Campusul „Mai-e-puțin” de 20 de milioane de euro din Metalurgiei, promis gata în 2026, e în plin șantier. Drona lui Băluță arată armătură și bălării • LA MINE-N CARTIER
On Bulevardul Metalurgiei, a construction site is behind schedule for an educational campus promised by Mayor Daniel Băluță. The project, initially set for completion by 2026, includes a nursery, kindergarten, and school. As of September 2026, the site shows minimal progress, with only a concrete structure visible. Băluță reassured residents about school admissions for local children, emphasizing their priority. He also addressed the placement of 14 sports fields nearby, which were relocated to accommodate community needs. The new building will be integrated into the existing school system, with local children having priority for enrollment.