Ungaria reia, gradual, producţia la centrala nucleară de la Paks - Economica.net

Hungary's Paks nuclear power plant is gradually returning to capacity, currently operating at half its nominal power after reconnecting seven turbines. Prime Minister Peter Magyar confirmed production is increasing, with expectations to reach full capacity of 2,000 MW soon. The plant had previously faced shutdown due to low Danube water levels caused by drought. Government efforts are underway to raise water levels to prevent total shutdown. The Paks plant, built 44 years ago with Soviet technology, has never been fully disconnected.