Un tronson al Autostrăzii A7 a intrat în reparație. Parapetul de siguranță a fost distrus de numeroasele accidente

The Buzau Regional Directorate of Roads and Bridges is conducting safety works on A7, Lot 1 Dumbrava–Mizil, replacing over 100 damaged guardrails. The works aim to restore road safety elements and ensure proper traffic conditions. The section was opened on December 23, 2024, and spans 21 kilometers.