"Stâlpii Îndrăgostiți" de pe magnifica realizare a lui Negoiță: bulevardul crăpat de când a fost inaugurat. Pe margine, asfaltul hămesit înghite borduri, iar buruienile dau din cap confuze • LA MINE-N CARTIER

In Sector 3 of Bucharest, two streetlights on Iuliu Hațieganu Street are leaning due to unstable foundations caused by soil erosion. A local resident shared a photo highlighting the poor condition of the area, which is overgrown with weeds and has numerous potholes. Despite the recent modernization of the boulevard, which was completed in September 2023, the infrastructure is already showing signs of deterioration. The project aimed to improve traffic flow by expanding the road from two to four lanes, but the current state raises concerns about its long-term viability.