Primăria Timișoara a anulat licitația pentru execuția Inelului 2 Est și urmează să revizuiască proiectul tehnic

The Timișoara City Hall has decided to cancel the tender for the "Inelul 2 Est" infrastructure project, requiring a revision of the technical documentation. This project aims to improve connectivity between neighborhoods without relying on the central area. The total investment is 136.2 million lei, with the city contributing 58.2 million lei. The project includes the construction of two new bridges over the Bega River and the modernization of secondary streets, along with bike lanes and sidewalks. The project is co-financed by the Regional Program with 77.9 million lei.