Primăria Oradea asfaltează strada Augustin Maior, care leagă DX 16 de Parcul Industrial I (FOTO)
The newly asphalted road connecting the Express Road 16 to the Eurobusiness Industrial Park will significantly reduce travel distance for drivers. This modernization of Augustin Maior Street, costing 1.85 million lei, will provide a direct route, eliminating a 5-kilometer detour. The project includes a 514-meter road, sidewalks, green areas, and public lighting with LED lamps. Construction began in May and is being carried out by PORR Construct.