Parc fotovoltaic de peste 500 de milioane de euro, în județul Arad / ”E cea mai mare investiție privată făcută în comuna noastră”
A solar park with a capacity of 365 MWp is being built in Horia, Arad, with an investment exceeding 500 million euros. It will include energy storage and is expected to be operational by early 2028. The project will create jobs and contribute to the local budget. This is the second solar park in Horia, following a previous one with a capacity of 45 MWp. Additionally, five solar projects are underway in Vladimirescu, including a large one in Pilu and Grăniceri, planned to be the largest in the country at 1.3 GWp.