Miruță: Nivelul apei la Centrala de la Cernavodă a crescut cu 2 cm după intervenția de pe Brațul Bala

The interim Minister of Defense, Radu Miruță, announced a 2 cm increase in water levels at the Cernavodă Nuclear Power Plant, contrary to forecasts predicting a decrease. This increase is attributed to a successful controlled detonation operation aimed at improving water flow in the Danube. The operation involved over 100 military personnel and was crucial to prevent the plant's shutdown due to low water levels. Miruță emphasized the economic benefits of maintaining the plant's operation.