Guvernul alocă 5,1 milioane de lei pentru dragarea Dunării, în contextul riscului de oprire a reactoarelor de la Cernavodă
The Romanian government will hold an extraordinary meeting to allocate 5.1 million lei for dredging works on the Danube due to severe drought conditions. This funding aims to manage water levels and reduce risks to the Cernavodă Nuclear Power Plant's operations. The meeting is scheduled for 4 PM and will take place in a hybrid format. The allocated funds will be split between two critical dredging points, with each receiving 2.55 million lei. The total estimated cost for the emergency intervention is 17.5 million lei, with previous allocations already made for similar purposes. The government emphasizes the urgency of these measures to ensure energy supply continuity.