Guvernul a aprobat indicatorii pentru Autostrada Brașov-Făgăraș / Investiție de 9,35 miliarde de lei / Ar urma să fie realizată în 3 ani

The Romanian government has approved the technical-economic indicators for the long-awaited Brașov-Făgăraș Highway, which will span nearly 50 kilometers. This project aims to significantly ease traffic on one of Brașov County's busiest routes. Estimated at 9.35 billion lei, with 7.94 billion allocated for construction, the highway is set to be completed in 36 months. It will run entirely within Brașov County, passing through several localities. The route was determined through a multicriteria analysis and will feature modern standards, including a 26-meter platform and two lanes in each direction. The highway will connect to the future Sibiu-Făgăraș Highway and will include 52 major structures, including bridges and tunnels, all built to European load standards.