FOTO: Noul pod peste Arieș din Câmpeni, testat cu autocamioane de 42 de tone. Când va fi deschis circulației

The new bridge over the Arieș River in Câmpeni has successfully passed a static load test with four trucks weighing 42 tons each. This test aimed to assess the bridge's structural behavior under real conditions. The mayor announced that the bridge will be opened to traffic shortly after the completion inspection, scheduled in the coming days. The bridge, measuring 37.60 meters in total length, is designed to last at least 120 years and can support a load of 252 tons. This infrastructure project is crucial for improving road connectivity in Câmpeni.