Cehia oprește un reactor nuclear sovietic care s-a defectat. Ce se știe despre incidentul nuclear
A unit at the Temelin nuclear power plant in the Czech Republic was unexpectedly shut down due to a malfunction. CEZ reported that Reactor 2 was disconnected after a control system issue was detected. Technicians replaced a faulty electronic board and further checks are ongoing. Reactor 1 remains operational at full capacity. Reactor 2 had just been restarted in April after maintenance. Critics highlight concerns over the combination of Russian reactor technology and American control systems. The Czech Republic aims to increase its nuclear energy share significantly by 2040, with plans for new reactors at Dukovany.