economedia.ro/furnizor-saudit-dezvolta-proiecte-hi

Saudi renewable energy developer Altaaqa Renewables has received approval for two hybrid projects in Romania, totaling 63 MWp solar capacity and 80 MWh battery storage. Construction of Cuza Vodă 1 and Cuza Vodă 2 is expected to start in early 2027, with commercial operation anticipated by the end of 2028. Both projects are located in Dobrogea, Romania, with Cuza Vodă 1 having 28.3 MWp solar capacity and Cuza Vodă 2 34.7 MWp. Altaaqa Renewables is a subsidiary of Altaaqa Alternative Solutions, part of the Zahid industrial group.